Download Print this page

Installation - Crown EC-20T Installation & Operation Manual

Self-generating steam jacketed tilting kettle

Advertisement

I
NSTALLATION

Installation

U
NPACKING
Immediately after unpacking the steamer, check for possible shipping damage. If the steamer is found to be damaged,
save the packaging material and contact the carrier within 15 days of delivery.
Installation Instructions
1. Select a location to provide drainage directly below the pour path of the kettle. Position appliance to allow sufficient
rear clearance from wall to tilt freely and completely without obstruction.
2. Mark hole locations through flanged adjustable feet. Remove kettle.
3. On hole locations marked, drill holes and insert expansion shields to accommodate 5/16" size lag bolts.
4. Reposition kettle. Level kettle by making necessary adjustments on flanged feet.
5. Bolt down kettle and seal with Silastic or other equivalent sealing compound. Sealant must be applied not only to bolt
heads but also around flanges making contact with floor surface to fulfill NSF International requirements. Wipe off
excess sealant immediately.
6. A control box with power supply equivalent to electrical rating of kettle should be located conveniently nearby.
7. A waterproof electrical connection from power supply to rear of control housing must be provided.
8. Ground kettle to terminal provided inside control housing.
9. Turn power ON and check for proper operation.
Electrical and grounding connections must comply with the applicable portions of the National Electrical
Code and/or other local electrical codes.
Disconnect electrical power supply and place a tag at the disconnect switch to indicate you are on the circuit.
6
PAGE
OF 24
IMMEDIATELY INSPECT FOR SHIPPING DAMAGE
ELECTRICAL GROUNDING INSTRUCTIONS
INSTALLATION & OPERATION MANUAL 10067 REV 8 (12/21)
Self-Generating Steam Jacketed Tilting Kettle
WARNING
WARNING

Advertisement

loading