Site Planning
6.
7.
8.
9.
10.
11.
12.

Unpacking and Checking the Contents of your Shipment

The shipping package for the Cisco ASR 901 10G router is designed to reduce the possibility of product
damage associated with routine handling experienced during shipment. Do not remove the router from
its shipping container until you are ready to install it.
Do not discard the packaging materials used in shipping your Cisco ASR 901 10G router. You will need
Note
the packaging materials in the future if you move or ship the router.
The Cisco ASR 901 10G router, cables, and any optional equipment you ordered may be shipped in more
than one container. When you unpack the containers, check the packing list to ensure that you receive
all of the following items:
Inspect all items for shipping damage. If an item appears to be damaged, or if you encounter problems
installing or configuring your router, contact customer service. The Cisco Information Packet provides
warranty, service, and support information.

Required Tools and Equipment

You need the following tools and equipment to install and upgrade the router and its components:
Cisco ASR 901 10G Series Aggregation Services Router Hardware Installation Guide
2-6
Determine space requirements.
Determine power requirements.
Identify required procedures or tests.
Make a preliminary plan that locates each Cisco ASR 901 10G router that you plan to install.
Verify the list of replaceable parts for installation (screws, bolts, washers, and so on).
Check the required tools list to make sure the necessary tools and test equipment are available (see
the
"Required Tools and Equipment" section on page
Perform the installation.
Router
Accessory kit (for DC routers) containing:
Terminal block (part number 27-1892-01)
Two hole lug, 6-AWG ground wire, number10 blue stud (part number 32-0619-01)
Two pan-head Phillips screws used to attach the lug to the router, 10-32x.365inch
Two cable clamp (part number 52-0685-01)
Two pan-head Phillips screws used to attach the cable clamps to the router (part number
48-1163-01), size number 6-32
Accessory kit (for AC routers) containing:
One two-hole lug, 6-AWG ground wire number 10 blue stud (part number 32-0619-01)
Two pan-head Phillips screws used to attach the lug to the router, 10-32x.365inch
One cable tie for AC power cord (part number 700-33927-01)
Cisco Information Packet publication
Chapter 2
Preparing to Install the Router
2-6).