5.
Connect the charger power cord to a power
source.
6.
Ensure that the InfoCenter screen shows that
the batteries are charging.
Note:
The InfoCenter shows the battery charge
percentage and amperage.
Batteries with a lower voltage charge first; once
they reach the voltage of the other batteries, all
batteries charge simultaneously
When charging is complete, the machine
InfoCenter displays 10 solid bars
7.
When the machine reaches a sufficient level,
disconnect the charger connector from the
machine connector.
8.
Place the charger connector and cord in a
storage position that avoids damage.
9.
Start the machine.
10.
Verify the charge level using the InfoCenter
display.