Service; Checking The Gas Supply Pressure; Check Flue Integrity; Checking Flue System For Tightness - Worcester GREENSTAR 24 Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing combination boiler
Table of Contents

Advertisement

Service

SERVICE FUNCTION B.F: START DELAY
This service function allows you to set the time in seconds before the
appliance starts DHW heating. Set the start delay in accordance with
system conditions.
If a start delay is set, the demand signal is no longer
possible  page 32.
The start delay can be set between 0 - 50 seconds.
Standard setting is 00 (disabled).
8
SERVICE
8.1

CHECKING THE GAS SUPPLY PRESSURE

NOTICE:
▶ Ensure that the gas pressure is satisfactory with all
other gas appliances working.
▶ Do not continue with the other checks if the correct
gas pressure can not be achieved.
▶ Switch off the appliance and turn off the gas tap.
▶ Undo the plug on the test port for gas supply pressure and connect a
pressure gauge.
Fig. 59
▶ Turn on the gas tap and switch on the appliance.
▶ Hold down the Central Heating boost button
The display shows the flow temperature alternating with
maximum heating output setting.
▶ Press the Central Heating boost button
show the flow temperature alternating with
output.
▶ Check that the gas working pressures in the system conform to the
figures shown below:
Allowed mbar pressure drop
meter/
across
boiler inlet across
regulator
pipework
Natural gas
19 - 23
1
18 - 22
Table 24
38
6 720 614 395-22.1O
until it illuminates.
=
again and the display will
= maximum rated
gas control
boiler
valve
1.5
16.5 - 20.5
Meter
Natural Gas
19 - 23 mbar
Boiler inlet
1 mbar
drop
18 - 22 mbar
Fig. 60 Natural gas pressure
The appliance must not be operated if the pressure is
above or below these figures. Determine the cause and
correct the fault. If that is not possible, securely seal off
the gas supply to the appliance and contact the gas
supply utility.
▶ Repeatedly press the Central Heating boost button
extinguishes.
The display will show the Central Heating flow temperature.
▶ Switch off the appliance, turn the gas tap to OFF, remove the
pressure gauge and refit the plug.
▶ Refit the outer casing.
8.2

CHECK FLUE INTEGRITY

Central Heating boost button
The following appliance output can be selected by holding down the
Central Heating boost button
• 1st press =
= maximum heating output setting
• 2nd press =
= maximum rated output
• 3rd press =
= minimum rated output
• 4th press = EXIT from Central Heating boost.
3
4
2
5
1
6
max
Fig. 61
You have 15 minutes in which to measure the levels.
After that, the appliance reverts from "boost" mode to
standard mode.
8.3

CHECKING FLUE SYSTEM FOR TIGHTNESS

Measure the CO
levels in combustion air.
2
Use an annular-gap flue gas probe for this test.
Gas Control
valve
16.5 - 20.5 mbar
1.5 mbar
drop
6720644744-44.1Wo
until the light
until it illuminates:
reset
eco
3
4
e
2
6
1
min
max
6 720 615 065-18.1O
6 720 811 922 (2014/07)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 28Greenstar 3047-406-5447-406-5647-406-64

Table of Contents