Download Print this page

Cornelius IDC PRO 255 Service Manual page 5

Splash panel installation and removal
Hide thumbs Also See for IDC PRO 255:

Advertisement

Installing the Upper Splash Panel
Guide the upper splash panel up around the ice dispense lever and the dispensing nozzles.
Align the two hooks on each side of the upper splash panel with the two slots on the right side
and left side of the cladding. Insert the hooks into the cladding and push down to ensure the
hooks lock into place.
Insert the thumbscrew and tighten down.
Close the merchandiser and check for ice agitation and dispense.
**Improperly installed upper nozzle cover can interfere with the touch screen closing completely.
This will prevent ice agitation and ice dispense
• Slots in cladding
• Hooks on nozzle
cover
5
5

Advertisement

loading