Epson EB-S01 Service Manual page 137

Business/home projector
Hide thumbs Also See for EB-S01:
Table of Contents

Advertisement

EB-S01/W01/X14G/S11/X11/S02/S02H/X02/W02/S12/S12H/X12/W12/X14 EH-TW480
When installing the SPRING,ML FASTEN, take care in the following.
1. Slide the MULTI LENS;A in the direction of arrow (1), and attach the
SPRING,ML FASTEN ( ).
2. While pressing the MULTI LENS;A in the direction of arrow (2), attach
the SPRING,ML FASTEN ( ).
SPRING,ML FASTEN (1)
MULTI LENS;A
LIGHT GUIDE,LOWER
SEIKO EPSON
SPRING,ML FASTEN (2)
2
1
Figure 4-32.
Maintenance
When installing the SPRING,ML FASTEN, make sure to set the springs with
the top of them touching the top surface of the LIGHT GUIDE,LOWER.
After installing the SPRING,ML FASTEN, confirm there is no gap between
the bottom of MULTI LENS;A and the LIGHT GUIDE,LOWER.
(See Figure 4-30, Figure 4-31.)
137
CONFIDENTIAL
MULTI LENS;A
SPRING,ML FASTEN
LIGHT GUIDE,LOWER
Figure 4-33.
Revision C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents