installation for damage or proximity to supporting
structure or cabinet. At least 1/4 inch clearance is
required around electric heater coils.
c. Check tightness of all terminal connections, clamps,
screws, etc., as these may have become loose in
shipment.
d. Tighten all electrical connections after equipment has
been in operation and components have reached
operating temperature.
13. Install the magnets into the door. The magnets should lock
into place once installed.
14. Close electric heater control panel access door, replace
heat section access panel, and unit control box access
panel.
15. Replace horizontal supply cover. Be careful when
replacing cover and verify gasketing is not torn or missing.
Gasket must make a water tight seal.
16. Scratch out the square on unit nameplate showing heater
model installed in unit.
ACC-SVN228B-EN
Installation
9