Download Print this page

Trane Precedent FIAEHTB309 Series Installation Instructions Manual page 8

Packaged rooftop units 6 to 25 tons - standard efficiency

Advertisement

Installation
Figure 4. Electric heater assembly
8. Secure the electric heater element assembly with the
necessary amount of screws.
9. Slide the electric heater control panel/access door
assembly inward until the rear edge engages with retaining
clips. See
Figure
2. Secure the control panel with screws
at the top against the vestibule panel and against the
indoor divider panel. See
Figure 5. Electric heater control panel/access door
assembly
10. To install the hinged door stops, loosen one existing screw
from the upper left side of the electric heater compartment
opening. Position each door stop with outer tab flush
against center post and secure each door stop with one or
two screws.
8
Figure
5.
Figure 6. Hinged door stops
Hinged panel
11. Wire control voltage to indoor options module using the
suppled harness. Route wires from heater assembly to
indoor options module in main control box. Refer to
Figure 19
for indoor option module location. Stage 1 to J6
and stage 2 (if installed) to J7. Refer to included schematic
and main unit sheet 5 for remaining balance of circuit.
NOTICE
Use Copper Conductors Only!
Failure to use copper conductors could result in
equipment damage as the equipment was not designed
or qualified to accept other types of conductors.
WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury.
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state/national electrical codes.
12. After heater is installed and before applying power, verify
the following:
a. Heating elements are not damaged or pinched.
b. Heating elements are not short circuited to each other
or to the heater frame or equipment cabinet.
Test every heater element with ohmmeter and verify
heater element terminals are electrically isolated from
cabinet and ground (infinite resistance). On downflow
units with or without duct work installed or horizontal
units without ductwork installed, remove horizontal
supply cover and carefully inspect elements after
Magnets
ACC-SVN228B-EN

Hide quick links:

Advertisement

loading