Furuno FR-1500 MARK-3 Series Installation Manual page 22

Hide thumbs Also See for FR-1500 MARK-3 Series:
Table of Contents

Advertisement

Wiring
1. Remove the display unit cover.
2. Dismount the clamping plate from the cable clamp by loosening two screws.
3. Lay the signal cable and power cable inside the cable clamp. Fasten the clamping
plate to the cable clamp by using two M4x15 screws. If optional equipment are
connected, secure the clamping plate by using two M6x35 bolts.
4. Connect the power cable and signal cable by referring to the interconnection
diagram. Fasten shields to chassis.
5. Run a ground wire (IV-8 sq, or equivalent) from the ground terminal to nearest
ground point.
2-6
Figure 2-9 Display unit, rear view, cover removed
Figure 2-10 Display unit, rear view

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fr-1505 mark-3Fr-1510 mark-3Fr-1525 mark-3

Table of Contents