Check Charge; Heating Check Chart Procedure; Verify 226A / Ch17 Units For Proper Switching Between Low & High Stages; Unloader Test Procedure - Bryant Base Series Application Manual And Service Manual

Residential air conditioners and heat pumps
Table of Contents

Advertisement

Residential Air Conditioners and Heat Pumps Using R-22 and Puron® Refrigerant: Application Guideline and Service Manual
Fig. 47 – Defrost Control

CHECK CHARGE

(See Charging
Table 11
&
Table
Factory charge amount and desired subcooling are shown on unit rating
plate. Charging method is shown on information plate inside unit. To
properly check or adjust charge, conditions must be favorable for
subcooling charging. Favorable conditions exist when the outdoor
temperature is between 70_F/21.11_C and 100_F/37.78_C, and the
indoor temperature is between 70_F/21.11_C and 80_F/26.67_C. Follow
the procedure below:
Unit is factory charged for 15ft (4.57 m) of lineset. Adjust charge by
adding or removing 0.6 oz/ft of 3/8 liquid line above or below 15ft (4.57
m) respectively.
For standard refrigerant line lengths (80 ft/24.38 m or less), allow system
to operate in cooling mode at least 15 minutes. If conditions are
favorable, check system charge by subcooling method. If any adjustment
is necessary, adjust charge slowly and allow system to operate for 15
minutes to stabilize before declaring a properly charged system.
If the indoor temperature is above 80_F /26.67_C, and the outdoor
temperature is in the favorable range, adjust system charge by weight
based on line length and allow the indoor temperature to drop to
80_F/26.67_C before attempting to check system charge by subcooling
method as described above.
If the indoor temperature is below 70_F / 21.11_C, or the outdoor
temperature is not in the favorable range, adjust charge for line set length
above or below 15ft (4.57 m) only. Charge level should then be
appropriate for the system to achieve rated capacity. The charge level
could then be checked at another time when the both indoor and outdoor
temperatures are in a more favorable range.
NOTE: If line length is beyond 80 ft (24.38 m) or greater than 20 ft
(6.10 m) vertical separation,
charging requirements.
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
13)
See Long Line Guideline for special

Heating Check Chart Procedure

To check system operation during heating cycle, refer to the Heating
Check Chart on outdoor unit. This chart indicates whether a correct
relationship exists between system operating pressure and air
temperature entering indoor and outdoor units. If pressure and
temperature do not match on chart, system refrigerant charge may not be
correct. Do not use chart to adjust refrigerant charge.
Verify 226A / CH17 units for proper switching
between low & high stages
Check the suction pressures at the service valves.
should be reduced by 3-10% when switching from low to high capacity.
Compressor current should increase 20-45% when switching from low
to high stage. The compressor solenoid when energized in high stage,
should measure 24vac.
When the compressor is operating in low stage the 24v DC compressor
solenoid coil is de-energized. When the compressor is operating in high
A05378
stage, the 24v DC solenoid coil is energized. The solenoid plug harness
that is connected to the compressor has an internal rectifier that converts
the 24v AC signal to 24v DC.
WITHOUT AN INTERNAL RECTIFIER.

Unloader Test Procedure

The unloader is the compressor internal mechanism, controlled by the
DC solenoid, that modulates between high and low stage. If it is
suspected that the unloader is not working, the following methods may
be used to verify operation.
1. Operate the system and measure compressor amperage. Cycle the
unloader on and off at 30 second plus intervals at the thermostat
(from low to high stage and back to low stage). Wait 5 seconds
after staging to high before taking a reading. The compressor
amperage should go up or down at least 20 percent.
2. If the expected result is not achieved, remove the solenoid plug
from the compressor and with the unit running and the thermostat
calling for high stage, test the voltage output at the plug with a DC
voltmeter. The reading should be 24 volts DC.
3. If the correct DC voltage is at the control circuit molded plug,
measure the compressor unloader coil resistance. The resistance
should be approximately 330 or 1640 ohms depending on unloader
coil supplier. If the coil resistance is infinite or is grounded, the
compressor must be replaced.
64
Suction pressure
DO NOT INSTALL A PLUG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents