Inlet: Connection For The End Of A Cover Line / Switch Or Remote Control P - Pentair SPEEDEO CONNECT Installation And User Manual

Table of Contents

Advertisement

Inlet: connection for the end of a cover line
N
L
230 V ~
1 - Connect the cables in accordance with the diagram.
2 - Start the secured Install menu (from the main menu, simultaneously hold down Esc and Valid for 3 secs. A star appears in the top
right corner of the home screen).
3 - On the Inlets / E1-E2 sub-menu (in accordance with chosen terminal), select COVER CONTACT to indicate that a limit contact has
been connected to the corresponding inlet.
4 - On the Filtration time / Cover Open sub-menu, select YES so that filtration is carried out while the cover is open (the cover does
not cover the pool). This is the primary function of the Filtration time / Start setting (despite the setting of an hour from the start
and/or end of filtration, if the cover does not cover the pool all day, filtration will run all day).
5 - On the Filtration Speed / Events / Cover Open sub-menu, select YES so that the filtration speed changes from S1 to S2.
Inlet: connection for a switch, a remote control...
It is possible to connect any type of dry contact inlet (switch, remote control, relay) which
activates an outlet.
N
L
230 V ~
1 - Connect the cables in accordance with the diagram.
2 - Start the secured Install menu (from the main menu, simultaneously hold down Esc and Valid for 3 secs. A star appears in the top
right corner of the home screen).
3 - On the Inlets / E1-E2 sub-menu (in accordance with chosen terminal), select OTHER to indicate that a dry contact has been connected
to the corresponding inlet.
Inlet: connection for an air temperature probe (see p10)
18
The contact is closed when the cover is covering the pool

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-pf-spo-004a

Table of Contents