Grounding The Device - Planet IGS-5225-8P4S-12V Quick Installation Manual

Industrial l2+ multi-port full gigabit managed ethernet switch
Hide thumbs Also See for IGS-5225-8P4S-12V:
Table of Contents

Advertisement

2. Tighten the wire-clamp screws for preventing the wires from loos-
ening.
IGS-5225 Series
1. The wire gauge for the terminal block should be in
the range from 12 to 24 AWG.
2. Please check the wire AWG Ampere specification
Note
before connecting PLANET Industrial Managed Switch.
PWR1 and PWR2 must provide the same DC voltage
for power load balance while operating with dual power
input.
Caution

3.1 Grounding the Device

Users MUST complete grounding wired with the device; otherwise, a
sudden lightning could cause fatal damage to the device.
8
1
2
3
4
V+
V-
Power 1
Positive (+) Pin
Pin 1/5
DI0
DI1 DO0 DO1
GND
GND
1 2 3 4 5 6
Max. fault loading: 24V, 1A
1 2 3 4 5 6
DC Input:
48-56V
5
6
V+
V-
Power 2
Negative (-) Pin
Pin 2/6
Earth Ground
, 6A max.

Advertisement

Table of Contents
loading

Table of Contents