• When removing the memory modules, label the slot number on each memory module, remove all the
memory modules from the system board (system board assembly), and set them aside on a static-
protective surface for reinstallation.
• When disconnecting cables, make a list of each cable and record the connectors the cable is
connected to, and use the record as a cabling checklist after installing the new system board
(system board assembly).
Attention:
• Read
"Installation Guidelines" on page 35
work safely.
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
"Power off the server" on page
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
• Put electrostatic-discharge gloves on before handling extremely sensitive electronic boards.
CAUTION:
Hazardous moving parts. Keep fingers and other body parts away.
CAUTION:
The heat sinks and processors might be very hot. Turn off the server and wait several minutes to let
the server cool before removing the server cover.
S002
ThinkSystem SR645 V3 User Guide
142
and
"Safety inspection checklist" on page 36
44.
to ensure that you