Final Check List - Scotsman Prodigy ELITE A Series Installation And User Manual

Hide thumbs Also See for Prodigy ELITE A Series:
Table of Contents

Advertisement

MC0322 through MC1030
Air and Water Cooled User Manual

Final Check List

After connections,
1. Wash out the bin. If desired, the interior of the bin
could be sanitized.
2. Locate the ice scoop (if supplied) and have it
available for use when needed.
Final Check List:
1. Is the unit located indoors in a controlled
environment?
2. Is the unit located where it can receive adequate
cooling air?
3. Has the correct electrical power been supplied to
the machine?
4. Have all the water supply connections been
made?
5. Have all the drain connections been made?
6. Has the unit been leveled?
7. Have all unpacking materials and tape been
removed??
8. Is the water pressure adequate?
9. Have the drain connections been checked for
leaks?
10. Has the bin interior been wiped clean or sanitized?
11. Have any water filter cartridges been replaced?
12. Have all required kits and adapters been properly
installed?
Lower Light and Switch Panel
This user accessible panel provides important
operational information and duplicates the lights and
switches on the controller. It also allows access to the
On and Off buttons that operate the ice machine.
Sometimes access to the switches should be limited
to prevent unauthorized operation. For that purpose a
fixed panel is shipped in the hardware package. The
fixed panel cannot be opened.
To install the fixed panel:
1. Remove the front panel.
2. From the back side of the panel, slide the door
to left while spreading the clips to remove the
original door from the bezel.
3. Slide the fixed panel into bezel until it snaps into
place.
4. Reinstall front panel.
June 2022
Page 13
Open door to access On
and Off switch buttons.