Installation In A Drop Line; Mounting The Sensor - Siemens SITRANS F MASS 2100 Operating Instructions Manual

Coriolis flowmeters
Hide thumbs Also See for SITRANS F MASS 2100:
Table of Contents

Advertisement

4.2.2.5

Installation in a drop line

Installation in a dropline is only possible if a pipeline reduction or orifice with a smaller cross-
section can be installed to prevent the sensor from being partially drained during the
measurements.
Figure 4-3
Unsuitable connecting parts
Risk of injury or poisoning.
In case of improper mounting, hot, toxic, and corrosive process media could be released at the
connections.
• Ensure that connecting parts (such as flange gaskets and bolts) are suitable for connection
4.2.2.6

Mounting the sensor

• Install the sensor in well-supported pipelines in order to support the weight of the flowmeter.
• Center the connecting pipelines axially in order to assure a stress-free installation. The
flowmeter must not be used to bring the rest of the pipework into line; make sure the
pipework is correctly aligned before inserting the flow sensor.
• Install two supports or hangers symmetrically and stress-free on the pipeline in close
proximity to the process connections.
SITRANS MASS 2100 & FC300 (FCT010/DSL)
Operating Instructions, 06/2020, A5E39788682-AB
Orifice Pipe
Valve
Installation in drop line
WARNING
and process media.
Installing/mounting
4.2 Installation instructions
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans f fc300Fct010/dsl

Table of Contents