General information: The installation must conform to
all local standards and regulations.

Reception of Units

Sound power levels
Unit Handling
The unit is supplied on wooden blocks. It is
Discharge
recommended to check the machine's condition upon
reception.
Measurement conditions:
There are two ways to handle the unit:
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
1) Handle the machine using a forklift, in accordance
long) fixed to its discharge opening.
with applicable safety regulations. Handling of the
unit is prohibited unless forks are longer than the
Fan
Unit
length of the unit.
speed
1
2) Use a lifting beam correctly adjusted to fit the unit.
FWD 08
2
3
The units are supplied on the truck but are not
1
unloaded. A lifting lug is provided on each corner of the
FWD 10
2
unit's base to facilitate handling. 4 shackles and 4 slings
3
1
are required.
FWD 12
2
Use a lifting beam to prevent the cables pressing too
3
1
hard on top of the unit during lifting.
FWD 14
2
Important: For unit to fit on the roof curb the wooden
3
1
blocks must be removed.
FWD 20
2
Lifting and moving Instructions
3
It is recommended to use the special built-in rigging
Intake
points shown in the diagram and the following
instructions:
Measurement conditions:
1 - Use the four rigging points which are built into the
Measurements taken at the horizontal air intake.
unit.
Fan
2 - Slings and a spreader bar are to be provided by the
Unit
speed
rigger.
1
FWD 08
2
3 - The minimum lifting capacity of each sling (with an
3
angle of 30° max) as the spreader bar must be equal
1
or higher than tabulated unit shipping weight.
FWD 10
2
3
4 - Caution : This unit must be lifted and handled with
1
care. Avoid shocks while handing.
FWD 12
2
3
1
FWD 14
2
3
1
FWD 20
2
3
RT-SVX060A-GB
UNT-PRC002-GB
Power level in dB(A), per Hz frequency band
125
250
500
55
50
42
57
54
47
58
57
50
57
51
45
58
54
48
60
58
50
57
51
45
58
54
48
60
58
50
56
62
50
61
66
55
63
69
58
57
63
51
61
66
55
63
69
58
Power level in dB(A), per Hz frequency band
125
250
500
56
55
55
63
62
60
66
65
63
62
58
55
66
63
60
70
67
63
62
58
55
66
63
60
70
67
63
66
65
65
73
72
69
78
76
73
68
72
64
76
76
68
78
79
71
Figure 2 - Lifting drawing
1000
2000
37
37
40
30
42
32
42
34
45
38
48
40
42
34
45
38
48
40
48
39
53
47
56
50
49
40
53
47
56
50

Roof Curb Installation

Roof curb option is not developed by Trane. However it
is possible to to use specific roof curb developed case by
case for down flow units. The roof curb should support
1000
2000
the unit and should ensure water tightness.
53
46
60
53
62
56
58
51
62
56
65
59
58
51
62
56
65
59
65
57
71
64
75
69
64
56
71
65
74
69

Installation

Overall power
4000
8000
dB(A)
31
30
46
38
40
50
40
43
53
33
28
48
39
35
51
42
39
54
33
28
48
39
35
51
42
39
54
38
36
56
46
45
60
50
49
63
39
37
57
46
45
60
50
49
63
Overall power
4000
8000
dB(A)
45
42
57
53
53
64
55
57
67
48
44
61
55
52
66
59
57
69
48
44
61
55
52
66
59
57
69
50
46
68
59
57
74
64
63
78
52
50
69
61
61
75
66
66
78
11
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airfinity xl ic

Table of Contents