Dimensions/Weights/Clearances; Connection Of Duct Network; Weight Colour; Galvanised Steel - Trane Airfinity XL IH Installation Operation & Maintenance

Table of Contents

Advertisement

Installation
Dimensions/Weights and Clearance
This information is supplied in the document package
shipped with the unit.
FWD

Connection of Duct Network

Power supply
Capacities
Supply and return openings have curb flanges provided
Cooling capacity on water (1)
for easy duct installation. It is recommended to insulate
Heating capacity on water (2)
the circumference of the curb after the unit is mounted
Fan motor
Fan power input (3)
to prevent condensation.
Current amps (3)
CAUTION! All ductwork must be run and attached to the
Start-up amps
Air flow
curb flanges before the unit is set into place.
minimum
nominal
Guidelines for ductwork construction
maximum
Main coil
- Connections to the unit should be made with 7.5 cm
Water entering/leaving connections
canvas connectors to minimize noise and vibration
Electric heater (accessory for blower only)
transmission.
Electric power supply
- Elbows with turning vanes or splitters recommended
Heating capacity
Hot water coil (accessory for blower only)
to minimize air noise and resistance.
Heating capacity (4)
- The first elbow in the ductwork leaving the unit should
G2 filter (filter box accessory)
Quantity
be no closer than 60 cm from the unit, to minimize
Dimensions ( LxWxth)
noise and resistance.
G4 filter (filter box accessory)
Quantity
Attaching horizontal ductwork to unit
Dimensions ( LxWxth)
Condensate pump (accessory)
- All conditioned air ductwork should be insulated
Water flow - lift height
to minimize heating and cooling duct losses. Use a
Not available for FWD30 and FWD45
minimum of 5 cm of insulation with a vapor barrier.
Sound level (L/M/H speed)
The outside ductwork must be waterproof between
Sound pressure level (5)
Sound power level (5)
the unit and the building.
Unit dimensions
Width x Depth
- When attaching ductwork to a horizontal unit, provide
Height
a flexible watertight connection to prevent noise
Shipped unit dimensions
transmission from the unit to the duct. The flexible
Width x Depth
connection must be indoors and made out of heavy
Height
Weight
canvas.
Colour
Note: Do not draw the canvas taut between the solid
Recommended fuse size
Unit alone (aM/gI)
ducts.
Unit with electric heater (gI)
(1) Conditions: Water entering/leaving temperature: 7/12 °C, Air inlet temperature 27/19°C DB/WB - Nominal air flow
(2) Conditions: Water entering/leaving temperature: 50/45 °C, Air inlet temperature 20°C DB - Nominal air flow
(3) At high speed with nominal air flow.
(4) Water entering/leaving temperature 90/70 °C, air inlet temperature 20 °C DB, Nominal air flow.
(5) A rectangular glass wool duct 1m50 long is placed on the blower.The measurement is taken in the room containing the blower unit.
Heat exchanger operating limits:
FWD:
*water temperature: max 100° C
*absolute service pressure: min 1 bar/max 11 bars
Accessories - Hot water coil:
*water temperature: min. +2° C/max. 100° C
*absolute service pressure: min 1 bar/max 11 bars
20
4
Technical Data

Condensate Drain Piping

Each unit is equipped with a 1 1/4" female drainage
connector. A P trap is supplied and must be connected
to the drainage as shown in Figure 5.
08
Slope the drainage pipe down at least 1% to ensure an
(V/Ph/Hz)
adequate condensate flow.
(kW)
5,2
Check all the condensate drainage pipe fittings comply
(kW)
6,3
with the applicable construction regulations and waste
(type)
(kW)
0,23
disposal standards.
(A)
1,1
(A)
3,2
Figure 6 - Supplied trap installation
(m
/h)
490
3
(m
/h)
820
3
(m
/h)
980
3
(type)
(Dia)
3/4"
(V/Ph/Hz)
230/1/50
(kW)
2/4
(kW)
6,3
2
(mm)
386x221x8
-
(mm)
-
(type)
Figure 7 - Drain piping location
(l/h - mm)
1: Removable unit drain pan
2: Gas burner drain pan
(dB(A))
36/40/43
(dB(A))
46/50/53
(mm)
890 x 600
(mm)
250
(mm)
933 x 644
(mm)
260
(kg)
32
(A)
8/16
(A)
16 (2kW),25 (4kW)
12
20
230/1/50
8,3
15
11,9
18,9
2 x direct drive centrifugal
0,46
0,65
2,2
3,1
5,5
9,3
980
1400
1650
2300
1970
2600
ISO R7 rotating female
3/4"
1 1/2"
230/1/50 or 400/3/50
400/3/50
8
10
12
17,4
2
2
486x271x8
586x321x8
2
2
486x264x48
586x314x48
Centrifugal
24 - 500
38/41/44
46/50/53
48/51/54
56/60/63
1090 x 710
1290 x 820
300
350
1133 x 754
1333 x 864
310
360
46
61

galvanised steel

8/16
8/16
40 (230V),3*16 (400V)
3*20
30
45
18,8
30,1
20,9
38,2
1,04
1,51
4,7
5,5
14,1
16,5
1800
2700
3000
4500
3600
5400
1 1/2"
1 1/2"
400/3/50
400/3/50
12
12
22,4
34,5
2
2
586*421*8
586*621*8
2
2
586*414*48
586*614*48
47/52/57
47/52/58
57/62/67
57/62/68
1290 x 970
1290 x 1090
450
650
1333 x 1008
1333*1133
460
660
76
118
8/25
8/25
3*25
3*25
2
1
RT-SVX060A-GB
UNT-PRC002-GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airfinity xl ic

Table of Contents