Time programs and time phases for central...
Additional time programs can be copied and applied
correspondingly:
Time programs for a heating circuit can be simulta-
■
neously transferred to another heating circuit.
To do so, copy "Heating circuit 1" instead of the
day of the week (in the Monday example).
■
You can simultaneously transfer time programs for
DHW heating to the DHW circulation pump or vice
versa.
Copy "DHW" or "DHW circulation pump" for this.
Changing time phases
Example:
For "Monday", you want to change the end time for
time phase 2 to 19:00.
Tap the following buttons:
01. Call up the home screen.
02.
press and hold for approx. 3 s.
03.
for "Time programs"
04. OK to confirm
05.
for "Heating"
06. OK to confirm
07.
for "Heating circuit 1" (required heating
circuit, if several heating circuits are installed)
08. OK to confirm
09.
for "Monday" (required day of the week)
Deleting time phases
Example:
For "Monday", you want to delete time phase 2.
Tap the following buttons:
01. Call up the home screen.
02.
03.
for "Time programs"
04. OK to confirm
05.
for "Heating"
06. OK to confirm
07.
for "Heating circuit 1" (required heating
circuit, if several heating circuits are installed)
(cont.)
10. OK to confirm
11.
for the time phase "15:00 - 21:00"
(required time phase that needs to be changed)
12. OK to confirm
13.
for "Edit"
14. OK to confirm
15. OK twice to confirm the unchanged start time
(hour and minutes)
16.
for the end time "19" (hours)
17. OK to confirm the new end time (hour)
18. OK twice to confirm the unchanged entries for end
time (minutes) and temperature level
19. OK to acknowledge the information
20.
for approx. 3 s, to exit the menu
08. OK to confirm
09.
for "Monday" (required day of the week)
10. OK to confirm
11.
for the time phase "15:00 - 19:00"
(required time phase that needs to be deleted)
12. OK to confirm
13.
for "Delete"
14. OK to confirm
15. OK to acknowledge the information
16.
for approx. 3 s, to exit the menu
Time programs
23