System Performance Verification Procedure - Agilent Technologies 5DX 5000 Series Installation Manual

Table of Contents

Advertisement

System Performance Verification Procedure

The following procedures should be closely followed to verify proper
system performance.These steps will verify that all levels are correct before
full power is applied to all assemblies.
AC Voltage Check
1.
PDU, unplug all subassembly AC power cords.
Make sure all connectors are properly seated prior to turning on the
a.
power, especially the connectors that attach to the back of the PDU.
System damage may occur if all connectors are not properly seated.
Turn the power
b.
WARNING
Voltage and current sufficient to cause severe shock or other
bodily damage are present in this assembly.
Check the bay AC voltage using line voltage safety precautions:
c.
The PDU output voltage should be between
d.
AC.
• Turn off mains power from the system at the facility circuit
breaker.
• Check the wiring into the PDU. Have the customer electrician
verify all wiring. Repeat this process until the range above is
reached.
If the output voltage is in the range, turn power off at the main circuit
e.
breaker on the rear of the PDU.
Reconnect all subsystem power cords.
f.
Verify the expansion chassis (PCI expansion box, below the CPU)
g.
power switch is
24
— After the site power (main) is connected to the
using the
ON
If it is not:
.
OFF
switch on the rear of the PDU.
195
volts, and
240 volts
Agilent 5DX Installation

Advertisement

Table of Contents
loading

Table of Contents