Download Print this page

Completing The Setup - Toro ProLine H800 Setup Instructions

Hide thumbs Also See for ProLine H800:

Advertisement

6
Positioning the Beacon
Light
No Parts Required
Procedure
1.
Raise the rollbar; refer to the Operator's Manual.
2.
Rotate the beacon light to the upright position
and secure the fasteners.
1. Operating position
7
Installing the Decals
Parts needed for this procedure:
1
Warning decal
1
Spark arrestor decal
1
Diesel fuel decal
Procedure
Note:
Ensure the decals are installed at the time of
sale or shown to the public for the countries listed in
the table on page 8.
Install the warning decal, spark arrestor decal, and the
diesel fuel decal
(Figure
Figure 9
10).
1. Warning decal—install
over the existing decal
2. Spark-arrestor decal
8

Completing the Setup

g316093
No Parts Required
Procedure
Complete the setup instructions that are in the
Operator's Manual.
7
Figure 10
3. Existing decal
4. Diesel fuel decal
g316208

Advertisement

loading

This manual is also suitable for:

31050te