Fan Guard/Louver Installation - Trane UHSB Installation, Operation And Maintenance Manual

S&p unit heaters
Table of Contents

Advertisement

OSHA Fan Guard/Louver
Cone Diffuser Installation
Detail
WARNING
Hazardous Voltage
Do not mount either the Louver
Cone Diffuser or OSHA Fan Guard
while unit is in operation or severe
personal injury may occur.
Disconnect all power supplies to the
unit before installing the Louver
Cone Diffuser or OSHA Fan Guard.
The figures below show how both
the OSHA Fan Guard and the Louver
Cone Diffuser are installed on the
Vertical Steam and Hot Water Unit
Heater.
Figure 20
and
Figure 21
detail how the louver cone diffuser
and OSHA guard are attached to the
unit.
Figure 22
and
Figure 23
full views of the vertical steam and
hot water unit with a Louver Cone
Diffuser and OSHA Fan Guard
attached.
To meet CSA and OSHA
requirements, units mounted below
8 feet (2.4 meters) must be equipped
with an OSHA Fan Guard.
The same screws and washers are
provided with both the OSHA fan
guard and Louver Cone Diffuser. The
screws and washers are used in
conjunction with the Nutserts to
support the wire guard or diffuser to
the orifice panel (bottom of vertical
unit).
UH-SVX01A-EN

Fan Guard/Louver Installation

show
Figure 20.
Louver Cone Diffuser
\
Figure 21.
OSHA Fan Guard
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uhpb

Table of Contents