Installation - Trane BAYHTR1504BRKC Installer's Manual

Supplementary electric heater
Table of Contents

Advertisement

INSTALLER'S GUIDE
NOTE: Illustrations may vary from the actual unit by cabinet and heater size.

INSTALLATION

1.
Remove Blower Access panel.
2.
Locate heater knock-out plate at rear of control box.
3.
With tin snips, cut the four tabs located at the
center points of the edges of knock-out plate.
4.
Discard knock-out plate.
5.
Slide heater into opening.
6.
Secure heater to control box opening with four
screws located at the corners of the mount plate.
See Figure 2 for screw locations. (One not visible in
photo)
8.
Locate the two locking tabs on the top panel of the
air handler; shown as "Left" and "Center" in the
drawing.
9.
Slide the breaker plate assembly into the
appropriate tab. Rotate the breaker assembly into
place as shown in image 4.
IMPORTANT: The left side breaker mount
location must be used for TEM8A0B24/30
air handlers, 25 kW heaters, and Single
Power Entry Kits.
The center breaker mount location should be
used for all other 4-20 kW heater installations.
Page 2 of 20 10/16/2019
Page 2
MOHS, PLANS EXAMINER
Left side breaker mount location shown
Figure 3 -
REV #1
2405 E AINSWORTH AVE
INSTALL HVAC SYSTEM/PORT OF PASCO
Figure 1
Figure 2
Left
Center
18-HB22D1-14
B19-2396
10/1/2019
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents