Verify The Operation Of A Replacement Dib; Return A Faulted Part - Dell EMC PowerStore 500T Installation And Service Manual

Hide thumbs Also See for EMC PowerStore 500T:
Table of Contents

Advertisement

Figure 126. Locking the DIB into place
3. Replace the Access Module as described in

Verify the operation of a replacement DIB

Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you replaced the DIB.
3. On the Components card, under Rear View, expand ExpansionEnclosure.
4. Select the relevant DIB.
The status of the replacement DIB should read Healthy. If the status is still Faulted, wait a few minutes and refresh
PowerStore Manager. If the status does not change, ensure that the DIB is correctly seated, or contact your service
provider.

Return a faulted part

About this task
For US customers, return defective material within five business days. For International customers, return defective material
within 10 business days. The materials required to return your defective part are supplied with the good part shipment.
Steps
1. Package the faulted part in the shipping box that contained the replacement part.
2. Ship the failed part to your service provider as described in the instructions that were included with the replacement part.
3. For more information about returning customer-replaceable parts:
a. Open PowerStore Manager.
Install an Access Module
NVMe expansion enclosure service procedures
on page 105.
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents