Download Print this page

Cooper Metalux CGTS NUV Installation Instructions Manual page 3

Surface mount
Hide thumbs Also See for Metalux CGTS NUV:

Advertisement

Available languages

Available languages

Installation Instructions
It is the installer's responsibility to create the
N
ote:
required electrical supply prior to installing the
mounting frames.
N
ote:
The 2x2 Installation Diagram. The 1x4, 2x4 and 2x2
installation method are the same.
Figure 7. 
Step 1: Mark the mounting hole position on the ceiling, using
the assembled frames as reference. (See Fig. 8.)
Mark the hole position on the celing
Figure 8. 
Step 2: Drill the holes according to the marks to suit
mounting surface.
Step 3: For masonry mounting, insert the wall plugs into the
holes.
Step 4: Secure the fully assembled frame onto the ceiling
with screws.
Step 5: Remove one side of the fully assembled frame.
CGTS NUV Surface Mount Instructions
Masonary mounting
Ceiling
Wall plugs
Screws
Figure 9. 
Step 6: Insert the LED panel light into the frame slot and
connect the driver and power supply.
Insert panel light & connect driver
Figure 10. 
Step 7: Reassemble the end piece onto the frame.
Figure 11. 
Step 8: Connect power and confirm correct operation.
Figure 12. 
CGTS NUV Surface Mount Instructions
IB519158EN
www.cooperlighting.com
Remove end
piece
Secure to ceiling
Re-connect power & test
3

Advertisement

loading