Powering Up The Brewer - Curtis IntelliFresh G4 GEMX User Manual

Hide thumbs Also See for IntelliFresh G4 GEMX:
Table of Contents

Advertisement

3.2

Powering up the Brewer

6 Turn on the water supply valve.
6 Make sure that the circuit breaker supplying power
to the unit is on.
6 Turn the toggle switch on the back of the brewer
to the ON position. The water tank will start to fi ll.
While the tank is fi lling, inspect the water supply
line for leaks.
6 Go to the Programming guide section and program
the brewer for the correct model and batch number.
• When operating the brewer at higher
elevations, reduce the factory set operating
temperature (200°F/92°C) by 2°F/1°C for
each 1000 ft./300 m of elevation above 4000
ft./1200 m.
6 When the water level in the tank rises to the
correct volume, the heating elements will turn on
automatically. Depending on the incoming water
temperature and the electrical specifi cations, the
water tank typically requires 20 to 30 minutes to
reach the factory set operating temperature.
When the water has heated "Ready to Brew" should
be on the display.
6 Before brewing for the fi rst time, dispense 350 ml
of hot water through the hot water faucet to help
purge air from the tubing inside the brewer.
6 Perform a brew cycle of a least 350 ml to purge any
remaining air from the system. During the initial
brew cycle and whenever the fi lter is replaced, you
may hear the sounds of air being purged from the
fi lter, tubing and water tank.
User manual Curtis G4 GEMX IntelliFresh
Operation | Powering up the Brewer
Programming guide
 p age 28
IMPORTANT
Programming guide
 p age 28
Programming guide
 p age 28
21

Advertisement

Table of Contents
loading

Table of Contents