Introduction; Inspection Upon Receipt; Proper Location And Clearance; Initial Set-Up 3 - Hussmann HGL-1BS Installation And Service Instructions Manual

Bottom / top mount self-contained merchandisers
Hide thumbs Also See for HGL-1BS:
Table of Contents

Advertisement

INTRODUCTION, INSPECTION UPON RECEIPT , PROPER LOCATION
Introduction –
Hussmann HGL-TS/BS models are
self-contained, low temperature, vertical dis-
play merchandisers for ice cream and frozen
foods. Design features include heated glass
doors for fog free visibility, automatic defrost,
efficient foamed in place non-CFC insulation,
cord connection for 208-230 volt application
and balanced refrigeration systems for energy
saving performance.
Inspection upon receipt –
Upon receipt of the cabinet, carefully
examine the crating for damage. If crate is
damaged, make a note on the delivery ticket
before signing. Carefully remove shipping
crate and examine cabinet for "concealed"
damage. If damage is found, contact the de-
livery carrier immediately and have his agent
prepare an inspection report for the purpose
of filing a claim. THIS IS YOUR RESPONSI-
BILITY.
Proper Location & Clearance –
Avoid locating the cabinet where direct
sunlight would shine into the fixture or where
drafts from air conditioning grills, fans and
open doors could affect its operation.
Because the condensing unit is located
at the top of the HGL-TS, at least twelve (12)
inches of clearance should be allowed at the
rear of the cabinet and at the top of the case.
This clearance is necessary to provide free air
movement to and from the condenser for
maximum operating efficiency.
CLEARANCE, AND INITIAL SET-UP
Page 3
Because the condensing unit is located on the
bottom of the HGL-BS, at least twenty four (24)
inches of clearance should be allowed in front of
the case and six (6) inches of clearance at the
rear to provide the necessary free air movement
to and from the condenser for maximum operat-
ing efficiency.
Initial Set-Up
Skid –
The skid should be left on the case until it
is near its final location. The skid provides pro-
tection for both case and floor. The skid is re-
moved by raising one end of the case approxi-
mately six inches. Block securely and remove
the two skid bolts on the raised end. The proce-
dure is repeated on the opposite end. When the
skid bolts are removed, the case may be slid off
the skid.
Leg Installation – Top Mounts Only
After the case is near its final location
and the skid has been removed, the NSF ap-
proved legs should be installed. The legs are
packaged inside the cabinet. Replace the tape
and door blocks. To install legs, raise one end of
the cabinet approximately eight (8) inches, block
securely, and install two legs. The leg mounting
plates are factory installed and contain a ½ x 13
tapped hole to mate with the leg assembly. The
procedure is repeated on the opposite end. The
3-door requires legs in the center. With cabinet
legs installed, the cabinet should be positioned in
its final location and leveled.
The cabinet is leveled by turning the bot-
tom section of each leg. The self-closing doors
require the cabinet to be properly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hgl-1tsHgl-2tsHgl-2bsHgl-3bsHgl-3tsHgl-bs

Table of Contents