[C] Sequence - Hoshizaki KML-200MAE Service Manual

Modular crescent cuber
Hide thumbs Also See for KML-200MAE:
Table of Contents

Advertisement

[c] SEQUENCE

1st Cycle
1. Unit energized and Control Switch to "ICE"
position. Water supply cycle starts.
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
2. After 1 minute,
Defrost cycle starts.
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
12
3. Thermistor reads 48° F.
Defrost Timer (adjustable from
1 to 3 minutes) starts counting.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.
IMPORTANT

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kml-200mwe

Table of Contents