Survey Of The Preventive Maintenance Work - AGFA Classic E.O.S. User Manual

Hide thumbs Also See for Classic E.O.S.:
Table of Contents

Advertisement

Survey of the preventive maintenance work

Preventive maintenance and cleaning of the Classic E.O.S. at regular intervals
will keep the Classic E.O.S. running smoothly and ensure optimum processing
quality.
Maintenance table
A survey of this cleaning and maintenance work is listed in the table below. The
procedures themselves are explained in detail in the Classic E.O.S. Reference
manual (page references).
Interval
Daily
Weekly
Monthly
Every three
months
Every six
months
Yearly
Ad hoc
If you do not comply with the above-mentioned maintenance instructions,
there might be a loss of photographic quality. If the processor is not main-
tained correctly, the proper functioning and the safe operation of the
machine are no longer guaranteed.
24
Maintenance work
Clean the feed table.
If possible, switch the Classic E.O.S. off overnight.
Clean the tank covers and film guide elements.
Check the ground fault switch.
Clean the tanks and roller sets.
Clean the squeegee roller set.
Clean the pumps.
Clean the dryer roller sets.
Procedure for skilled service personnel only.
Clean the water filter.
Procedure for skilled service personnel only.
Have the rack bearings and gears checked by your local service
organization.
Clean the film scanner.
Have the replenishment settings checked by your local service
organization.
Have the rack bearings and gears checked by your local service
organization.
Page
54
20
56
59
66
68
97
104
54
1281C GB 20001204

Advertisement

Table of Contents
loading

Table of Contents