Rinnai EX08DT Installation And Operation Manual page 18

Direct vent wall furnace
Table of Contents

Advertisement

5. Lock the ties.
Pulling hard on the left and right hand ties, clip the ties over the notches inside the sleeve. You
should be able to pull the ties 2 or 3 notches past the starting point. Cut the ties, leaving about
1 1/4 inch (30 mm) past the notch. Bend the ties back into the sleeve and parallel to the wall.
Locking ties
Clip the ties over
the inside sleeve
and cut the ties
sticking out.
Pull hard on the left and right hand ties.
Figure 13
6. Insert Inside Connection Assembly.
Push the assembly into the terminal tube, ensuring that the seal is in place on the inner tube.
Attach the inside connection with 3 screws. The inner connection can still be turned to install the
screws.
3 screws
Figure 14
18
Sleeve
Locking tie
EX08DT and EX11DT Installation and Operation Manual
Top
Sleeve
Locking ties (2 locations)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex11dtRhfe-203ftaRhfe-266fta

Table of Contents