5. Lock the ties.
Pulling hard on the left and right hand ties, clip the ties over the notches inside the sleeve. You
should be able to pull the ties 2 or 3 notches past the starting point. Cut the ties, leaving about
1 1/4 inch (30 mm) past the notch. Bend the ties back into the sleeve and parallel to the wall.
Locking ties
Clip the ties over
the inside sleeve
and cut the ties
sticking out.
Pull hard on the left and right hand ties.
Figure 16
6. Insert Inside Connection Assembly.
Push the assembly into the terminal tube, ensuring that the seal is in place on the inner tube.
Attach the inside connection with 3 screws. The inner connection can still be turned to install the
screws.
3 screws
Figure 17
EX38DT Installation and Operation Manual
Sleeve
Locking tie
Top
Sleeve
Locking ties (2 locations)
19