Plumbing Requirements - Scotsman C1848R Installation And User Manual

Remote condenser modular cuber
Hide thumbs Also See for C1848R:
Table of Contents

Advertisement

C1448, C1848, C2148 E Series
Remote Condenser Models - User Manual

Plumbing Requirements

All models require connection to cold, potable water.
A hand actuated valve within site of the machine
is required. There is a single 3/8" FPT inlet water
connection and a single 3/4 FPT drain connection.
Water Supply
Use field supplied fittings to connect potable water
to the water supply connection at the back of the
cabinet.
Water Filters
Install a new cartridge if the filters were used with a
prior machine
Water Fitting
Water Supply
Connection
Potable
Water
Supply
Vent for
Reservoir
Drain
Bin Drain
Drains
All models require drain tubing to be attached to them.
There is a single ¾" FPT drain fitting in the back of the
cabinet.
Install new tubing when replacing a prior ice machine,
as the tubing will have been sized for the old model
and might not be correct for this one.
1. Connect water supply to water inlet fittings.
2. Connect drain tubing to drain fitting.
3. Route the drain tubing to building drain. Follow
local codes for air gap.
4. Use rigid drain tubes and route them separately –
do not Tee into the bin's drain.
Vent the reservoir drain. A vertical vent at the back of
the drain, extended about 8 – 10" will allow the gravity
drain to empty and also keep any surges during
draining from discharging water.
Horizontal runs of drain tubing need a ¼" per fall per
foot of run for proper draining.
Follow all applicable codes.
February 2016
Page 11
Reservoir Drain

Advertisement

Table of Contents
loading

Table of Contents