Piping Diagram For Basic Installations - Rinnai Demand Duo CHS199100CUiP Installation And Operation Manual

Commercial hybrid water heating system
Table of Contents

Advertisement

Piping Diagram for Basic Installations

Commercial Hybrid
Single Unit Circulation
Note:
Installation must conform to applicable code and
all requirements listed in the installation manual.
Balancing valves, equivalent piping, pressure
gauges, and temperature gauges are to be used
as necessary to ensure proper flow between
units.
Condensate piping shall be CPVC or PVC material
and shall not be smaller than the drain
connection on the appliance.
Components of condensate drainage shall be
CPVC or PVC material. All components shall be
selected for the pressure and temperature rating
of the installation.
Where the drain pipes from more than one unit
are manifolded together for condensate
drainage, the pipe or tubing shall be sized in
accordance with an approved method as
dictated by local codes.
Condensate must be disposed of
according to local codes.
Condensate Drain Line
Pipe T&P to Open Drain
36
Building Hot Water Supply Line
Tank
T&P
Tankless
PRV
Building
Circulation
Pump
Rinnai Commercial Hybrid System Installation and Operation Manual
Cold Water Supply
Building Hot Water
Return Line
(Optional)
Gas Supply

Advertisement

Table of Contents
loading

This manual is also suitable for:

Demand duo chs199100cuDemand duo chs199100cuin

Table of Contents