Rinnai Demand Duo CHS199100CUiP Installation And Operation Manual page 28

Commercial hybrid water heating system
Table of Contents

Advertisement

2
Non-Direct Vent
(Room Air)
Exhaust
Vent termination per ANSI Z223.1/NFPA 54. For
clearances not specified in ANSI Z223.1/NFPA 54,
clearances are in accordance with local installation
codes and the requirements of the gas supplier.
28
Rinnai Commercial Hybrid System Installation and Operation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Demand duo chs199100cuDemand duo chs199100cuin

Table of Contents