Maintenance Inspection Report - Terex Genie Super Series Service Manual

Table of Contents

Advertisement

September 2016
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Instructions
• Make copies of this page to use for
each inspection.
• Select the appropriate checklist(s) for
the type of inspection to be
performed.
Daily Inspection: A
Quarterly Inspection: A+B
Annual Inspection: A+B+C
• Place a check in the appropriate box
after each inspection procedure is
completed.
• Use the maintenance tables in this
section and the step-by-step
procedures in section 4 to learn how to
perform these inspections.
• If any inspection receives an "N",
remove the machine from use, repair
and re-inspect it. After repair, place a
check in the "R" box.
Legend
Y = yes, acceptable
N = no, unacceptable
R = repaired
Comments
Part No. 40462

Maintenance Inspection Report

Checklist A
Refer to Table A
A-1
Operator's
and Responsibility
manuals
A-2
Decals and placards
A-3
Damage, loose or
missing parts
A-4
Hydraulic leaks
A-5
Auxiliary lowering
operation
A-6
Manual lowering
operation
A-7
Battery and charger
- DC models
A-8
Columns
A-9
Sequencing cables
A-10 Interlock system
operation
A-11 Power and
function controls
A-12 Lifting chains
and idler wheels
A-13 Breather cap
DPL-25S • DPL-30S • DPL-35S Super Series
Section 3 - Scheduled Maintenance Inspections
Y N R
Checklist B
Tools are
Refer to Table B
required
B-1
Electrical wiring
B-2
Welds
B-3
Lifting chain
adjustments
B-4
Battery
B-5
Clean and lubricate
columns
B-6
Lifting capacity
B-7
Power to platform
operation
B-8
Sequencing cables
B-9
Proper outrigger
length
Checklist C
Refer to Table C
C-1
Casters and wheels
C-2
Mast assembly
C-3
Lifting chains
C-4
Hydraulic oil
C-5
Auxiliary platform
lowering batteries
Y N R
Dealer
New parts
service
required
suggested
Y N R
3 - 5

Advertisement

Table of Contents
loading

Table of Contents