Installing The Processor Unit; Deck Mount - Furuno SC-120 Operator's Manual

Satellite compass
Table of Contents

Advertisement

2.3

Installing the Processor Unit

The processor unit should be mounted aligned with the ship's fore-and-aft line. It
can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a
mounting location which allows you to easily view the power lamp on the top of
the unit and which is within 2.5 of the ship's fore-and-aft line.
2.3.1

Deck mount

1. The processor unit is factory adjusted for deck mounting. Fasten the
processor unit to the mounting location with tapping screws (5 x 20, 4 pcs.).
The unit can be oriented in one of the directions shown in the figure below.
After the unit is installed you will specify the mounting method from the menu.
Mount processor unit
so reference
direction is within
±
2.5
°
fore-and-aft line.
Name plate
Port
Port
2. Fasten the ground wire between the ground terminal on the processor unit
and the ship's superstructure.
of
Connectors
Processor Unit, top view
Bow
Mounting Method: "Floor"
Mounting Direction: A
Starboard
DIRECTION "A"
Stern
Bow
Mounting Method: "Floor"
Mounting Direction: C
Starboard
DIRECTION "C"
Stern
Processor unit orientation, deck mounting
Reference Direction
POWER switch
(power lamp)
Bow
Mounting Method: "Floor"
(Deck)
Mounting Direction: B
Port
Stern
Bow
Mounting Method: "Floor"
(Deck)
Mounting Direction: D
Starboard
Port
Stern
2. INSTALLATION
(Deck)
Starboard
DIRECTION "B"
(Deck)
DIRECTION "D"
2-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents