Mitsubishi Electric CRHV-P600YA-HPB Service Handbook page 24

Hot water heat pump
Table of Contents

Advertisement

[ II Restrictions ]
1. Check that the spring washer is in a parallel position.
* If the screw is biting into the washer, simply fastening the screw to the specified torque cannot determine whether it
has been installed properly.
Loose screws
2. Check that the wiring does not move at the screw terminal.
2 Take extra care not to ruin the screw thread due to fastening the screw at an angle.
* To prevent fastening the screw at an angle, install the round terminals so they are back to back.
3 After fastening the screw, use a permanent marker to tick off the screw head, washer and terminal.
Ticked with marker
Important: Power supply cables larger than 25 mm
block (TB2). Use a pull box to connect them.
<3> Installing the conduit tube
• Punch out the knockout hole for wire routing at the bottom of the front
panel with a hammer.
• When putting wires through knockout holes without protecting them
with a conduit tube, deburr the holes and protect the wires with
protective tape.
• If damage from animals is a concern, use a conduit tube to narrow the
opening.
• Always use a conduit to run the power supply wiring.
• Select the conduit size based on the knockout hole.
HWE1312A
Properly installed
Spring washer is in a parallel position
For transition wiring
Power supply wiring
Install the round terminals so they are back to back.
Power supply terminal block
2
in diameter are not connectable to the power supply terminal
- 17 -
Knockout hole
ø39 control wiring (high voltage)
ø39 control wiring
ø62 power supply wiring
(low voltage)
Burr
GB