Installing Stand-Offs - Napoleon BGD36CFNTRE Installation And Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

30
Minimum clearance to combustible construction from appliance and vent surfaces:
Combustible Framing:
EN
-
-
-
Combustible Finishing:
-
-
-
Rear Exit
-
-
Top Exit
-
-
* HORIZONTAL VENT SECTIONS - A minimum clearance of 1" (25mm) at the bottom and sides and 2"
(5.1cm) at the top of the vent pipe on all horizontal runs to combustibles is required. Use fi restop spacer
W010-1777 (supplied).
* VERTICAL VENT SECTIONS - A minimum of 1" (25mm) all around the vent pipe on all vertical runs to
combustibles is required except for clearances in appliance enclosures. See "MINIMUM ENCLOSURE
CLEARANCES" section. Use fi restop spacer W500-0096 (not supplied).
6.1

INSTALLING STAND-OFFS

These appliances are supplied with two standoffs. For
convenience, the standoffs have been shipped fl at and located on
the top at the front. Before framing ensure the standoffs are bent
up and screwed into place ensuring a height of 4 1/2" (114.3mm).
NOTE: The information and dimensions in this section
represent the minimum clearances to combustible material.
It is best to frame your appliance after it is positioned and the
vent system is installed. Use 2x4's and frame to local building
codes.
A steel header is required if using optional clean face surround.
W415-1345 / C / 02.14.17
3 1/2" (89mm) from top of stand-offs
1" (25mm) to bottom and sides of the vent pipe*
2" (51mm) to top of the vent pipe*
0" to rear
0" to front face and sides, 6 1/2"(165mm) for top
17 1/4" (438mm) recessed depth
40 1/2" (991mm) to enclosure top from base of the appliance
54" (1372mm) to ceiling from base of the appliance
49" (1245mm) to enclosure top from base of the appliance
54" (1372mm) to ceiling from base of the appliance

Advertisement

Table of Contents
loading

Table of Contents