INSTALLATION AND OPERATION MANUAL, GAS KETTLES
3.0 PERFORMANCE CHECK
The following items should be checked before or within the first 30 days of operation by a
qualified service technician.
1.
Verify correct gas type.
2.
Verify correct voltage, cycle and phase.
3.
Gas pressure.
4.
Internal gas connections.
5.
Internal electrical connections.
6.
Pilots - adjustment and ignition.
7.
Burners - adjustment and ignition.
8.
Thermostat - cycle for operation check.
9.
Supply valve - check for operation.
10. Check hinge and lid assembly.
11. Draw-off valve - check operation.
12. Advise user on cleaning procedures.
10125R4
Models GL-20E, GL-40E, GL-60E, GL-80E, GL-100E
11