Step 2 Concrete Pad And Operator Attachment - Chamberlain CSW24UL Installation Manual

Commercial dc vehicular swing gate operator
Table of Contents

Advertisement

Step 2 Concrete Pad and Operator Attachment

CHECK the national and local building codes before installation.
NOTE: When lifting the operator use the handle to avoid damaging the
operator
1. Install the electrical conduit.
2. Pour a concrete pad (reinforced concrete is recommended). The
concrete pad should be 6 inches (15.2 cm) above the ground and
deeper than the frost line. Ensure the pad is tall enough to avoid
possible flooding.
3. Secure the operator to the concrete pad with appropriate fasteners.
NOTE: An alternative to a concrete pad is to post mount the operator, see
Accessories.
INSTALLATION
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elite seriesCsw24u

Table of Contents