System Installation
1
2
Fig. 3
Polydoros SX 65
•
Move the power cabinet into its location.
•
Attach the top of the cabinet to the wall with retaining brackets to prevent the cabinet
from tilting.
•
If required, the cabinet can also be bolted to the floor.
•
If required, remove the cover for the corresponding cable inlet on the generator cabinet.
•
Move cabinets A12 and A13 to their location according to the project plan or the above
example (Fig. 1).
•
The splash guard has to be installed between the control cabinet A 12 and the shock
wave cabinet A13. If necessary, turn it around.
•
Install the sidewalls of the cabinets.
•
Within the scope of validity of the UL regulations (e.g. USA) the metal case should not be
removed due to fire protection.
•
Install the enclosed screw (1/Fig. 3) with nut (2/Fig. 3) to a cabinet to connect the cabinet.
Then move the second cabinet to its position and tighten with nut (4/Fig. 3) and flat
washer (3/Fig. 3).
p
•
Move the cabinets to their final position and bolt them to the wall and the floor.
Installing and Connecting the High Voltage Charger
•
Unpack the charging unit, place it on the rails provided in the shock wave cabinet above
the electronics unit N12 and secure it on the front using 4 screws.
•
Connect the power line cable at N12 (1 on L1, 2 on N and ge/gn on PE).
•
Plug in the cable from the N12, K108 to the charger controller on the charger.