Download Print this page

Daewoo DTR-14D9ME Service Manual page 9

Hide thumbs Also See for DTR-14D9ME:

Advertisement

ALIGNMENT INSTRUCTIONS
6-3. The adjustment of VERTICAL SIZE
6-3-1. Receive PAL RETMA pattern(signal of company:PAL-B 2CH).
6-3-2. Press the PR up/down Keys (
Adjust with Vol Up/Down (
pattern may be located at the boundaries of the screen.
6-4. The adjustment of HORIZONTAL CENTER
6-4-1. Receive PAL RETMA pattern(signal of company:PAL-B 2CH).
6-4-2. Press the PR up/down Keys (
Referring to the both side scales, adjust with Vol Up/Down (
so that RETMA pattern may be symmetrical.
6-5. The adjustment of Vertical Linearity
6-5-1. Receive PAL CROSSHATCH pattern(signal of company:PAL-B 5CH).
6-5-2. Fix adjustment of Vertical Linearity after EEPROM presetting,
but it can be adjusted in case of need.
6-5-3. Press the PR up/down Keys (
Adjust Vertical Linearity with Vol Up/Down (
6-6. The adjustment of VERTICAL S-Correction
6-6-1. Receive PAL CROSSHATCH pattern(signal of company:PAL-B 5CH).
6-6-2. Fix adjustment of Vertical S-Correction after EEPROM DATA presetting,
but it can be adjusted in case of need.
6-6-3. Press the PR up/down Keys (
Adjust S-Corrction with Vol Up/Down (
All manuals and user guides at all-guides.com
) to select V-SIZE.
) keys so that the upper and the lower of RETMA
) to select V-SIZE.
) to select V LINEAR.
) to select S CORRECT.
-8-
) keys
) keys.
) keys.

Advertisement

loading