Shipment And On-Site Transport; Accepting The Delivered Goods; Removing The Packaging From The Regulator - Samson EB 2111 Translation Of Original Instructions

Table of Contents

Advertisement

4 Shipment and on-site trans-
port
The work described in this section is only to
be performed by personnel appropriately
qualified to carry out such tasks.
4.1 Accepting the delivered
goods
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Check that
the specifications on the valve and con-
trol thermostat nameplate match the
specifications in the delivery note. See
the 'Markings on the device' section for
nameplate details.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
3. Determine the weight and dimensions of
the units to be lifted and transported in
order to select the appropriate lifting
equipment and lifting accessories. Refer
to the transport documents and the 'De-
sign and principle of operation' section.
EB 2111/2121/2123 EN

Shipment and on-site transport

4.1 Removing the packaging
from the regulator
The components (valve, control thermostat
and, if applicable, accessories) of the regu-
lator are delivered separately.
Proceed as follows to lift and install the
valve:
Î Do not open or remove the packaging
until immediately before lifting to install
the regulator into the pipeline.
Î Leave the regulator components in its
transport container or on the pallet to
transport it on site.
Î Do not remove the protective caps from
the inlet and outlet until immediately be-
fore installing the valve into the pipeline.
They prevent foreign particles from enter-
ing the valve.
Î Dispose and recycle the packaging in ac-
cordance with the local regulations.
4-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eb 2121Eb 2123 en

Table of Contents