Shipment And On-Site Transport; Accepting The Delivered Goods; Removing The Packaging From The Regulator - Samson 42-20 Mounting And Operating Instructions

Differential pressure regulators
Table of Contents

Advertisement

4 Shipment and on-site trans-
port
The work described in this section is only to
be performed by personnel appropriately
qualified to carry out such tasks.
4.1 Accepting the delivered
goods
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Check that
the specifications on the valve and actua-
tor nameplate match the specifications in
the delivery note. See the 'Markings on
the device' section for nameplate details.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent (re-
fer to delivery note).
3. Determine the weight and dimensions of
the units to be lifted and transported in
order to select the appropriate lifting
equipment and lifting accessories. Refer
to the transport documents and the 'De-
sign and principle of operation' section.
EB 3007 EN

Shipment and on-site transport

4.2 Removing the packaging
from the regulator
The components (valve, actuator and, if ap-
plicable, accessories) of the regulator are
delivered separately.
Proceed as follows to lift and install the
valve:
Î Do not open or remove the packaging
until immediately before lifting to install
the regulator into the pipeline.
Î Leave the regulator components in its
transport container or on the pallet to
transport it on site.
Î Do not remove the protective caps from
the inlet and outlet until immediately be-
fore installing the valve into the pipeline.
They prevent foreign particles from enter-
ing the valve.
Î Dispose and recycle the packaging in ac-
cordance with the local regulations.