Mounting The Unit; Installing The Drain Connection (Optional) - Greenheck ASSURE-120S-S1 Installation, Operation And Maintenance Manual

Residential energy recovery ventilators
Table of Contents

Advertisement

Mounting the Unit

Applicable Units: ASSURE-120S-S1, SYNC-110SE-S1, and SYNC-180SCE-S1
1.
Using the hardware provided, install the mounting brackets on the unit. It is important to
isolate the mounting brackets from the mounting surface to minimize vibration.
2.
Install the unit to the mounting surface, using the mounting brackets provided.
Note: The ASSURE-120S-S1 and SYNC-110SE-S1 can only be ceiling mounted.
The SYNC 180SCE-S1 can be either ceiling mounted or wall mounted.
Due to natural condensate accumulation, the unit must have the door hinges directed towards the floor in wall mount configuration (SYNC-

Installing the Drain Connection (Optional)

Applicable Unit: SYNC-270TCE-S1. In climates where the outdoor temperature remains above
13ºF (-25ºC) combined with an indoor humidity less than 30%, the use of a drain is optional.
During a defrost cycle, the ERV unit may produce some condensation. This water should flow
into a nearby drain, or be taken away by a condensate pump.
The ERV cabinets has pre-punched holes for the drain as illustrated in "Figure 23. Drain Holes
and P-Trap".
1.
Insert the drain spout through the hole in the drain pan.
2.
Tighten the nut which holds the drain spout in place.
Construct a P−Trap using the plastic tee connector as illustrated in "Figure 23. Drain Holes and
P-Trap".
1.
Cut two lengths of hose and connect each piece to an end of the T fitting, then connect the
other ends to the two drain spouts.
2.
Position the T fitting to point upward, and connect the drain line. Tape or fasten base to
avoid any kinks.
3.
Pour a cup of water into the drain pan of the ERV after the drain connection is complete.
This creates a water seal which will prevent odors from being drawn up the hose and into
the fresh air supply of the ERV.
Condensation can accumulate and cause water damage to equipment, finished surfaces and structures.
Do not install ERV or route condensate drain lines in areas that can be subjected to freezing. Potential water damage.
Unit must be installed level to ensure proper condensation drainage. Avoid installing units above areas or equipment that are sensitive to
water damage. Connect condensate drains in accordance with national and local codes. P−Trap and tubing must be located below the ERV
®
HINGES
Wall Mounted
Must have hinges downward
towards the floor
(SYNC-180SCE-S1 only)
Figure 22. Ceiling Mounting vs. Wall Mounting
Do not drill additional holes in the ERV
Do not use sealant when installing the drain spout.
door with a minimum of ¼" per foot downward slope away from unit.
Ceiling Mounted
IMPORTANT
180SCE-S1 only).
CAUTION
Figure 21. Mounting Brackets
Drain Hose Plumbing
Pre-Punched Holes (2)
Drain Pan
Drain Pan
Drain
Spout
Zip Tie
Tee Connector
To Drain
Hard Pipe Plumbing
Pre-Punched Holes (2)
Drain Pan
Drain
Spout
Tee
Joint
1/2" (13mm)
Hard Pipe
Figure 23. Drain Hole and P-Trap
Residential Energy Recovery Ventilators
Mounting Brackets
Drain
Spout
1/2" (13mm) I.D.
Drain House
Drain Pan
Drain
Spout
To Drain
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sync-110se-s1Sync-180sce-s1Sync-270tce-s1

Table of Contents