Connect Power - Graco Reactor E-20 Standart Operation

Table of Contents

Advertisement

Setup
Connect

Connect Power

Connect
Power
Power
All electrical wiring must be done by a
qualified electrician and comply with all local
codes and regulations.
1. Turn the main power switch (MP) OFF.
2. Open the electrical enclosure door.
NOTE: The terminal jumpers are located
NOTE:
NOTE:
inside the electrical enclosure door.
3. Install the supplied terminal jumpers in the
positions shown in the image for the power
source used.
NOTE: Ensure the terminal jumpers are fully
NOTE:
NOTE:
inserted and lay flush.
4. Route the power cable through the strain
relief (EC) in electrical enclosure.
5. Connect the incoming power wires and
ground wire as shown in the image. Gently
pull on all connections to verify they are
properly secured.
6. Verify that all items are connected properly
as shown in the image then close the
electrical enclosure door.
26
ti39334a
3A8500C

Advertisement

Table of Contents
loading

Table of Contents