Setting A Thermostat Jumper For Humidity Operation - Carrier 33CS450-01 Owner's Manual

7-day programmable commercial thermostat
Hide thumbs Also See for 33CS450-01:
Table of Contents

Advertisement

Setting a Thermostat Jumper for
Setting a Thermostat Jumper for
Humidity Operation
Humidity Operation
To operate one of the MISC outputs using humidity-based operation,
place the MISC1, MISC2, or MISC3 jumper on the terminal labeled
HUM (see diagram below). This will supply 24VAC to the selected
MISC terminal based on the humidification programming in the
following pages. Only one of the three outputs (MISC1, MISC2, or
MISC3) is required to have this jumper. For more information
regarding the MISC1, MISC2, and MISC3 outputs, please see
section 21.
9
In the diagram below, the MISC3 jumper
has been set for HUM (humidify) operation.
ELEC
GAS
W3
PROG
HP
HUM
GAS
DEHUM
ECON
Y2
B
(MISC1
MISC3
MISC2
MISC1
O
ONLY)
W1
W2
Y1
MISC1
G
RS2
MISC2
MISC3
CK1
RS+5
CKGND
Rs1
R
INSTALL HUMIDITY
MODULE WITH SENSING
RSGND
ELEMENT OUTWARD
C
MISC3
MISC3
OK
W3
PROG
HUM
DEHUM
ECON
MISC3
MISC2
IMPORTANT CAUTION
NEVER PUT MORE THAN ONE JUMPER
ON THE SAME MISC JUMPER BLOCK!
THIS MAY DAMAGE THE THERMOSTAT
Page 9.3
Carrier
Y2
(MISC1
MISC1
ONLY)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents