Date & Time; Diagnostics Menu; System-Level Tests; Subsystem Tests - IBM Universal Tape Library User Manual

Table of Contents

Advertisement

3. For each network option, press the Up or Down button to change a value. Press
4. When you have set the last value, press the Save button to save the changes
5. Press the Exit button. If you are prompted to cycle power for settings to take
6. Turn off the library and turn it on again.
Date & time
To set the date and time, complete the following steps:
1. From the Setup menu, press the Down (↓) button to select Date & time, and
2. Press the Up or Down button to select your time zone, and press the Enter
3. In the Set date & time screen, press the Up or Down button to change a value.
4. When you have set the last value, press the Save button to save the changes

Diagnostics menu

Press the Diags button to display the Diags menu.

System-level tests

To run a system-level test, complete the following steps:
1. From the Diags menu, press the Down (↓) button to select System-level tests
2. Press the Down button to select the test that you want to run, and press the
3. When the test is complete, press the OK button. The test results are displayed.
4. Press the Exit button to return to the Diags menu.

Subsystem tests

To run a subsystem test, complete the following steps:
1. From the Diags menu, press the Down (↓) button to select Subsystem tests,
2. Press the Down button to select the test that you want to run, and press the
3. When the test is complete, press the OK button. The test results are displayed.
4. Press the Exit button to return to the Diags menu.
Table 9. Network options
Option
Description
DHCP
If your network uses DHCP, enable this option. If your network uses
static addresses, disable this option.
IP address
Set the IP address if you are not using DHCP.
Subnet mask
Set the subnet mask if you are not using DHCP.
Default gateway
Set the default gateway if you are not using DHCP.
the Next button to select the next value that you want to set.
and return to the Network setup menu.
effect, press the OK button to return to the Setup menu.
press the Enter button.
button.
Press the Next button to select the next value that you want to change.
and return to the Setup menu.
(if it is not already selected), and press the Enter button.
Enter button. The test starts.
and press the Enter button.
Enter button. The test starts.
Chapter 3. Using the menus
23

Advertisement

Table of Contents
loading

Table of Contents