Download Print this page

LG 42PQ20 Training Manual page 82

Hide thumbs Also See for 42PQ20:

Advertisement

Circuit Interconnect Blowup
Control Board
Section
Circuit Interconnect Blowup
Control Board
Section
Note:
Pins 9 & 10 of connector P813 on the SMPS, if the
supply is working, should have 5V which under normal
operation supplies the Control Board with 5V via the Y SUS Board.
By using 5V STB, the following test will confirm Normal operation of
the Control Board if that supply is missing.
82
January 2009 Plasma
42PQ20

Advertisement

loading