Left And Right Door Switch Assemblies - GE Advantium 120 Technical Service Manual

Hide thumbs Also See for Advantium 120:
Table of Contents

Advertisement

Left and Right Door Switch Assemblies

The primary interlock, monitor interlock, and
door sensing (secondary interlock) switches are
mounted on plastic latch boards. The latch boards
are attached to the left and right side of the oven
cavity. The left side latch board contains the door
sensing (secondary interlock) switch. The right side
latch board contains the primary interlock and the
monitor interlock switches.
Door sensing
(Secondary
Interlock)
Right side Latch Board Shown
How to Test Primary Interlock and Door Sensing
Switches:
1.
Disconnect power and partially remove the
oven from it's installation. (See
)
Partial Removal.
Monitor interlock
switch
Primary interlock
switch
Monitor Interlock Switch
Primary Interlock Switch
Oven Removal /
– 38 –
2.
Remove the single Phillips-head screw that
holds each door switch access cover to the
outer cover.
3.
Remove the primary interlock and door sensing
switch leads to isolate each switch.
4.
Check continuity of each switch with door open
and door closed. Normal readings are as follows:
• Door Closed: 0 Ω
• Door Open: Infi nity
How to Test the Monitor Switch:
Note: The right side latch pawl pushes horizontally
and actuates the lever of the monitor interlock,
opening the switch.
1.
Disconnect power and partially remove the
oven from it's installation. (See
)
Partial Removal.
2.
Remove the single Phillips-head screw that
holds the right side door switch access cover to
the outer cover.
3.
Remove the monitor switch leads to isolate the
switch.
4.
Check continuity of the switch with door open
and door closed. Normal readings are as follows:
• Door Closed: Infi nity
• Door Open: 0 Ω
How to Test Interlock System:
1. Disconnect power, remove the outer cover (See
Oven Removal / Partial Removal
capacitor.
2. Check 20 amp fuse for continuity and proper
size. Do not use any other fuse or size except 20
amp.
3. Remove monitor switch leads to isolate switch.
Check continuity of switch with door open and
door closed.
• Door Closed: Infi nity Ω
• Door Open: 0 Ω
4. Reconnect switch wiring.
Oven Removal /
) and discharge
(Continued Next Page)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scb 1000Scb 1001Zsc 1000Zsc 1001

Table of Contents