Prepare The Bath With Airjets - Kohler K-1110 Installation Manual

Bath with airjets
Hide thumbs Also See for K-1110:
Table of Contents

Advertisement

Available languages

Available languages

3. Prepare the Bath with Airjets

For All Installations
Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the
trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath to protect the finish. Ensure
that the airjets are covered. Be careful not to scratch the surface of the bath.
Blower Motor and Check Valve Options
NOTE: This bath with airjets allows the blower motor and check valve to remain on the bath support
board (standard installation) that it is shipped or to be relocated in another location (remote installation).
Refer to your applicable installation, standard or remote, throughout this installation guide.
Standard Installation Sections
Secure to the Subfloor - Standard
Install the Plumbing - Standard
Make Power Connections - Standard
Test Run - Standard
Then go to the "Complete the Finished Deck" section.
Remote Location Sections
Disconnect the Blower Motor - Remote
Secure to the Subfloor - Remote
Mount the Blower Motor - Remote
Terminate the Cable at the Blower - Remote
Install the Power Cord at the Control - Remote
Install the Plumbing - Remote
Make Power Connections - Remote
Test Run - Remote
Then go to the "Complete the Finished Deck" section.
1035472-2-G
8
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1158K-1168K-1173K-1174K-1375K-1418 ... Show all

Table of Contents